Since completion of the chapter house in 1933, over 1,000 brothers have shared the memorable experience of living in our Chapter house. The Alumni Corporation Board (ACB) has spent many thousands of dollars and man hours over the years maintaining and improving the house, but 70 years of wear and tear is catching up. Rent revenues from active brothers are no longer sufficient to meet much tougher requirements imposed by the City of East Lansing, and to make the improvements necessary to insure another 70 years of Delta Sig memories. These improvements include: adding high-speed communication access to all rooms; installing an up to date fire alarm system; completing a major face-lift to public areas; providing an area for educational and meeting activities on the first floor; reconfiguring the lower level for student activities; and many other needed improvements to the structure and mechanical systems.


The Capital Campaign for Alpha Pi was created to achieve the improvement goals of the chapter and the ACB.
Campaign Contributors and Donation Amount by Decade
How to Contribute
Campaign History



Current Projects


Electrical Wiring Replacement

The chapter house's electrical wiring system was not designed for the modern student. Today, the average student has a computer, mini-fridge, stereo, tv and a number of other wall-powered items. To keep competitive with other housing options, the chapter requires the rewiring of several of its floors to handle the electrical load and to ensure the safety of the chapter's occupants.


Please email the ACB Treasurer if you would like to donate directly to this project.


Capital Campaign Phase III

The final phase of the Capital Campaign consists of the renovation of the chapter house's first floor. A new room will be added as well as an additional, more easily accessible bathroom.


View the proposed floorplan.



Recently Completed Projects


"War Room" Rennovation - Fall 2007

Several brothers took it upon themselves to refinish the open room on the first floor just outside of the President's room, referred to by actives and young alumni as the "War Room." Actives donated their own time and money to re-carpet and paint the room as well as adding a projector screen and an entertainment system (that included a HD projector). Special thanks to Grant Attenberger, Andrew Wilterink and Alex Fike for their hard work.


The project included:
• A new HD projector and screen
• Painting of walls and trim
• Replaced carpet
• Entertainment system including high-quality Sony speakers and a DVD player
• New lighting and lighting controls


Kitchen Rennovation & Misc - Summer 2006

Kitchen Rennovation

Again, this project was initiated by several active brothers over the summer months. These brothers performed all of the work involved with repairing and panneling the kitchen's walls and ceiling. The project cost roughly $1,200, excluding the new stoves ACB provided for the 'new' kitchen.


The project included:
• Professional-grade RFP paneling on the kitchen walls
• Stain-resistent ceiling panneling
• Two new stoves


Capital Campaign Phase II - Completed Fall 2004

Phase II - Completed Fall 2004

Here is a summary of the work completed:
• Opened up the lower level by removing walls and installing 900lbs I beam
• Waterproofed and insulated all exterior walls and window wells
• Installed commercial grade steel doors w/ commercial latches & closers.
• Installed T&G Pine wall covering over foam insulation on exterior walls.
• Replaced electrical circuits and install can lights in new suspended ceiling.
• Installed ceramic tile flooring.


Additional Improvements:
• A beautiful mission style oak table & six chairs for library / alumni room was purchased and delivered (special thanks to Bob & Audrey Martin)
• New circuits to exterior; install new lighting and power outlets
• Upgraded utility room into laundry area
• Replaced / upgraded gutters and downspouts
• Replace Doll House front entry
• Several other small projects and repairs completed


View the new basement floor plan.


Capital Campaign Phase I - Completed Fall 2003

Too many improvements were made to fit on this page. Please visit the Phase 1 Page to learn more.